Webb Dock and Mcgraw Wharf Upgrade, Burnie TAS
Client: McConnell Dowell
Consulting Engineers: Jacobs
Project Value: $650,000
Asset Owners: Tasports and Toll
Scope of works:
- Design and construct
- Cavity bags for cavities located under the precast concrete wharf structure
- Scour mattresses for toe of ship load out wharf
- Remediation of 19 piles using Denso Seashield Marine 2000FD, piles averaging 15m in length
- Design, manufacture and install of scour solution, ScourTech
- Shipping schedule of the berth (TOLL Shipping Berth) – night works often required to maintain schedule
- Mobilisation to Burnie, Tasmania from Brisbane
- Provision of plant such as dive equipment, vessels, barges and pontoons
- Daily reporting to Client and adhering to their intensive site safety regime, including CMG’s internal daily reporting requirements
Product Specification:
- Total length of all piles was 259m, resulting in the use of 136 jackets
- Seven (7) scour mattresses 26m x 6m 450mm
- Twenty-seven (27) cavity bags in various sizes 1.5m x 2m x 450mm