Webb Dock and Mcgraw Wharf Upgrade, Burnie TAS

Client: McConnell Dowell

Consulting Engineers: Jacobs

Project Value: $650,000

Asset Owners: Tasports and Toll

Scope of works:

  • Design and construct
  • Cavity bags for cavities located under the precast concrete wharf structure
  • Scour mattresses for toe of ship load out wharf
  • Remediation of 19 piles using Denso Seashield Marine 2000FD, piles averaging 15m in length
  • Design, manufacture and install of scour solution, ScourTech
  • Shipping schedule of the berth (TOLL Shipping Berth) – night works often required to maintain schedule
  • Mobilisation to Burnie, Tasmania from Brisbane
  • Provision of plant such as dive equipment, vessels, barges and pontoons
  • Daily reporting to Client and adhering to their intensive site safety regime, including CMG’s internal daily reporting requirements

Product Specification:

  • Total length of all piles was 259m, resulting in the use of 136 jackets
  • Seven (7) scour mattresses 26m x 6m 450mm
  • Twenty-seven (27) cavity bags in various sizes 1.5m x 2m x 450mm