< Back to Projects

Urangan Harbour boat ramp – repair & installation of Scour Tech mattresses

Client: TMR

Project Date: 2025

Overview

  • Remove concrete toe planks from lanes
  • Reprofile the area with rock, ensuring alignment & stability, before reinstalling planks
  • Supply and place 20 tonnes of rock around shoulders of both ramps to reinforce the areas
  • Reinstate the toe with additional rock
  • Survey riverbed and remove obstructions before mattress installation
  • Install Scour Tech fabric formwork mattresses to ensure stable base on both boat ramps
  • Ensure mattresses are aligned and positioned correctly
  • Fill mattresses with concrete